Out with the old and in with the new.
Dan • July 24, 2020
New trenches to replace the old storm water pipe.
Area prepped ready for roadbase and some new pavers.
FUEL LEVYS PASSED ON BY OUR SUPPLIERS CAN NOT BE ABSORBED AND THE CORRESPONDING INCREASES WILL BE TEMPORARILY ADDED TO THE SELECTED BULK PRODUCTS RATES.
New trenches to replace the old storm water pipe.
Area prepped ready for roadbase and some new pavers.
ABN: 26 162 506 505